Wednesday 9 December 2009

Progress

P1080251

Firstly, here is my garden on a damp December morning taken from the 1st floor.  The idea is to link the garage with the shed via an L shape.  You can see the levels problem and the need for embankments and a viaduct just ahead of the garage. 

P1080253

I have done some preparatory work on the two Slaters kits, mostly to do with removing the casting nibs on the resin castings.  The De Winton already starts to look like an engine with just half and hour’s work!  Nothing is attached yet though.

I have also drilled out all the holes on the Quarry Hunslet’s tank and smokebox for handrails, fire iron brackets, smokebox door dart etc

P1080252

On the waggon front, I have mostly completed a Cooper Craft LNWR coal waggon and have started work on two Dinorwic slates.

Colin