I'm now abroad so there will be no progress until Friday but before I went today I managed:
- To attach the main blower pipe (copper) between the smokebox side and the cab
- To cut to length 4 copper pipes to be installed on the backhead
- Added weathering powders around the smokebox door and cab floor
- Added rust dry brushed onto the filler cap and smokebox rivets
- Touched up a few areas such as the handrails
Nearly there now!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment