So after a further day's work this is the state of play.
Sunday, 5 June 2011
Earthworks
The fact that our local DIY shop (focus) is closing down spurred me into action.
Firstly I have decided to use the GRS interlink system - http://www.gardenrailsystem.com/typical5.html
So I have purchased enough bricks, sand, gravel etc to complete the line.
Secondly I have started the base earthworks for the line allowing us to plant up the areas not affected by the alignment.
The shot above shows the bricks temporarily laid to show the position of the track.
Concrete will be used to ensure a good base for the bricks where the earth has been made up.
Saturday, 19 March 2011
Large scale show, Leamington
Today we attended the large scale show just off the Fosse Way near Leamington Spa.
I purchased a useful book…. http://www.amazon.co.uk/Garden-Railways-Ground-David-Pratt/dp/0955259800
and a flying bench cheap…
http://www.ipengineering.co.uk/page68.html
I’m not really expecting to run passenger trains, but this makes a useful ‘quarryman’s’ vehicle to go with the slate wagons.
Dad also purchased the zoo car:
http://www.ipengineering.co.uk/page64.html
to go with his other bugs and his Prince…which I’m sure will make visits to my garden line from time to time.
So, now I have to work out how to build the line this summer with the minimum of cost/time spent doing it….
Monday, 6 December 2010
Tuesday, 30 November 2010
duckets done
Monday, 29 November 2010
curly!
Finally, having checked photos of the real thing, I binned the truss rods in the kit (far too chunky and square section) and made some better circular section ones from wire myself.
Now I need to add kleenex tissues to the roof (yes really) and attach the duckets. This requires soaking thin plywood in hot water to shape it - ummm sounds fiddly! My practice attempt was ok but the top of the ducket has a very tight bend to form Might be easier in brass, but then I would still have to add the plywood overlay to that. Thinking cap on...!
Sunday, 28 November 2010
brakes off...
Here is the current state of construction - sides, ends and floor all glued together and roof supports glued in (the elastic bands are to hold it all square whilst it dries). Next come the beautiful overlays all made from laser cut plywood. Very impressive.
The bogies are already complete too.