As you can see below, much earth has been imported to the back garden from a project in the front garden. Today I laid out a circle of track to work out how wide this earthwork would need to be to accommodate the loop back on itself. The answer is about 1.8m.
Monday, 26 April 2010
Sunday, 25 April 2010
Bogies for the Gladstone
I wanted to add the bogies (and couplings in time) to the Gladstone so it can be ready for gauging and power trials once the garden earthworks are completed. Thus with a bit of drilling, countersinking and screwing tonight we have one carriage with wheels!
Monday, 12 April 2010
16mm show - the debut of Rough Pup
Check out this video of my engine passing some of the other 100 Hunslets!
http://www.youtube.com/watch?v=QNivf5k10_M
A great time was had by all (show report coming soon) and Rough Pup performed well.